Other beamlines: 8.3.1 12.3.1

8.3.1 last updated: Wed Jan 14 09:15:09 PST 2026
sample: no beam mark

camera:

hutch:

no movement for 165:59:53 since Jan 7 11:15:19 2026
beam:


hutch is dark
feedback system is off

last tuneup reached 305% of max at Dec 23 14:10:45 2025
final diode current was 193373 nA, equivalent to 6.111e+11 photons/s at div=2x0.35 mrad, 11111.0 eV and 500 mA (46.61 kGy/s)

cryostream is off at 297.51K, nozzle in, lN2 level is at 34% and set to autofill
expected to reach 20% at Wed Jan 14 21:24:16 PST 2026

CHL robot dewar is dry, level: unknown% and filling, supply idle_inhibit at 0.98 psi, as of 16 s ago.

current user is Maintenance with 390:44:44 left
next user is Beamline Commissioning at Jan 30 16:00:00
door closed for 283:03:50 since Jan 02 14:11:20 2026

00:00:08 ago last control activity at Jan 14 09:14:40 2026
281:48:43 ago at Fri Jan 02 15:26:05 PST 2026
collected: /data/mehaganh/test_0_00005.cbf

Exposure_time 90.0000000
Wavelength 1.11583
Detector_distance 600
Start_angle 0.1400
beam stop:

last 10 beam stops:



















/data is 62% full, still room for 3592423 images.

Other beamlines: 8.3.1 12.3.1