Other beamlines: 8.3.1 12.3.1

8.3.1 last updated: Fri Jan 02 16:10:39 PST 2026
sample: no beam mark

camera:

hutch:

no movement for 05:33:35 since Jan 2 10:37:26 2026
beam:


hutch is dark
feedback system is on

last tuneup reached 305% of max at Dec 23 14:10:45 2025
final diode current was 193373 nA, equivalent to 6.111e+11 photons/s at div=2x0.35 mrad, 11111.0 eV and 500 mA (46.61 kGy/s)

cryostream is off at 298.15K, nozzle in, lN2 level is at 33% and set to autofill
expected to reach 20% at Sat Jan 03 03:27:42 PST 2026

CHL robot dewar is dry, level: unknown% and filling, supply idle_inhibit at 0.98 psi, as of 58 s ago.

current user is Maintenance with 671:49:19 left
next user is Beamline Commissioning at Jan 30 16:00:00
door closed for 01:58:59 since Jan 02 14:11:20 2026

00:00:03 ago last control activity at Jan 02 16:10:20 2026
00:44:18 ago at Fri Jan 02 15:26:05 PST 2026
collected: /data/mehaganh/test_0_00005.cbf

Exposure_time 90.0000000
Wavelength 1.11583
Detector_distance 600
Start_angle 0.1400
beam stop:

last 10 beam stops:



















/data is 62% full, still room for 3606602 images.

Other beamlines: 8.3.1 12.3.1