BL831 gets power from 9 panels: ID # Location 1) 292A Front End, near Sector 8 Mono Chiller (Column 11 Line C) 2) 292A27A On Column at BL8.0 near BL7.3.1 SAX Hutch 3) 293A At far end of BL8.3.2 End Station Racks on (Column 10 line C) 4) 293A33A Frontend Work Stations of BL8.2.1&2 on Side of Overhead Racks BL0831 5) 294A33A Side of Rack BL0906 at BL9.0 EPS Racks 6) 329A3A Upstream side of BL8.3.2 End Station Overhead Racks (BL0872) 7) 329A9A Next to the Exit Door by roll-up door 8) 331A21A At End of BL8.2.2 End Station Overhead Racks (BL0856) near walkway 9) 331A34A At Begining of BL8.3.1 End Station Overhead Racks (BL0857) ### BL8.3.1 Has 4 Clusters of Instrument Racks, NOT counting the EPS Racks by BL8.0: ---> At Frontend, Overhead Racks above BL8.3.1 Work Area: 3 Racks: BL0834 - BL0832 BL0834 National Instruments DAQ: BL0833 beamline computer: ---> At Frontend, Overhead Racks above BL8.2.X Work Area: 10 Racks: BL0824 - BL0833 BL0830: BL8.3.1 Kozhu and Heidenhain BL083?: NI Amplifiers ---> At BL8.3.1 Endstation Work Area Overhead Racks: 8 Racks: BL0857 to BL0864 Computers, Motor Controllers, Amplifiers etc. ---> Next to BL8.3.2 Hutch: 2 Full Sized Racks: BL0865 BL0866 Ion Guages and Ion Pumps ########### Power Panels and where their Breakers send Power: ######## 1) ---->>>> 292A <<<<----- Next Mono Chiller ONLY Breaker used by us is for 70 Amp for Panel 292A27A, below 2) ---->>>> 292A27A <<<<----- (near BL7.3.1 SAX Hutch) ( Only 1 Breaker ) #1 Quad Drop INSIDE BL8.3.1 Hutch Power to: nothing critical, normally 3) ---->>>> 293A <<<<----- (BEHIND BL8.3.2 End Station Work Area) ( Ion Pumps and Guages) #2 2X Duplexes on front and read of BL0865,6 Power to: not normally used by BL8.3.1 #4 Plug strip inside BL0865,6 Power to: !!!! Pumps and Guages for BL8.3.1 !!!! #19 Yellow Quad Drop ust upstream or BL8.3.1 hutch : Power to: !!!! computer luke, cryojets, ethernet switch !!!! #21 Black Utility Pole next to 1st Gray Storage Cabinets Power to: nothing critical 4) ---->>>> 293A33A <<<<----- (End of 8.2.1,2 Front End Work Stations) #7 Power Strip on Rack BL0830 Power to: BL8.3.1 Kohzu Mono Controller #8 Power Strip on Racks BL0832 BL0833 Power to: !!!!? BL8.3.1 "beamline" Computer, NI DAQ (or #10?) #10 Power Strip on Rack BL0834 Power to: !!!!? BL8.3.1 "beamline" Computer, NI DAQ (or #8?) #22 Twist Lock box Outside and Above Rack BL0828 at REAR Power to: !!!! UPS in BL0828 which has Power Strip for BL8.3.1 Heidenhain Encocder #27 Twist Lock box on Black Unistrut Pole Power to: !!!! Sector 8 Mono Chiller !!!! #33 Twist Lock box High on Shield Wall by Power to: !!!! BL8.3.1 M1 Chiller !!!! 5) ---->>>> 294A33A <<<<----- Side of BL9.0 EPS Racks ? ( Only 1 Breaker Used by BL8.3.1) !!!!! But a critical componet which !!!!! should NOT be in a rack othewise NOT associated with our beamline!!! #3 Twist Lock box above BL8.3.1 Mini Hutch Door (Mis-Labeled inside the 294A33A PANEL as "Video Monitor" !!?? Power to: !!! Detector Chiller !!! 6) ---->>>> 329A3A <<<<----- (At END of BL8.3.2) #21 Quad Power boxes on Black Unistrut Piller by BL8.3.1 Mono Power to: Temporary Turbo Pumping, e.g. #22 208V Twist Lock Mounted on bottom of Wire Conduit above upstream BL8.3.1 Hutch Power to: !!! CHL heaters, !!! !! Beamstop Motor Power, too !!! 7) ---->>>> 329A9A <<<<----- (By Door to EXIT Outside) #24 4 Quad Power boxes inside BL8.3.1 Hutch on Blue Frame (NOT! Yellow Drop Quad): Power to: Quad Recepticals and Lights #38 GFCI Drop @ 8.3.1 Outside Hutch, Downstream Power to: Yellow Drop Quad Retangular 2X Duplex 8) ---->>>> 331A21A ( End of BL8.2.2 End Station Computer Desks) #1 Power Strip on Rack BL0857 Power to: Servers, Amps, Switches, etc. #3 Power Strip on Rack BL0859 Power to: Servers, Amps, Switches, etc. #5 Power Strip on Rack BL0861 Power to: Servers, Amps, Switches, etc. #7 Power Strip on Rack BL0863 Power to: Servers, Amps, Switches, etc. #2 All 8 "interuptible" 2XDuplex on front & back or Racks BL0857-64 Power to: What ever #4 Power Strip along work Area below BL0857-60 Power to: beamline computers, monitors and user devices #6 Power Strip along work Area below BL0861-64 Power to: beamline computers, monitors and user devices #8 Lights above Endstation Work area Power to: Lights #21 220V Twist Lock Receptical, Outside, Downstream, Above Hutch Power to: Detector Power Conditioner !!! #31 GFCI Drop @ 8.2.2 Hutch Down stream Power to: BL8.3.1 Work Bench #31 208V Twist Lock Receptical Inside top of Rack BLO857 Power to: UPS #33 208V Twist Lock Receptical Inside top of Rack BLO859 Power to: UPS #35 208V Twist Lock Receptical Inside top of Rack BLO861 Power to: UPS 9) ---->>>> 331A34A <<<<----- (Side of BL8.3.1 End Station Racks #33 Overhead light for Beamline 8.3.1 Power to: light ---->>>> Contents of Instrument Racks above BL831 work stations All Power comes from Panel 331A21A at end of BL8.2.2 BL0856 Power Strips in Racks use 20Amp Breakers #1-8 Breaker Numbers for UPS's are listed below in their Rack position. << Equiment connected to UPS's is shown in ()'s below BL0857: bl831a (UPS#2) archive2 dataserver2 (off) dataserver (off) (UPS#1) >> UPS#1 << Breaker #31 BL0858: 24 port switch (UPS#1) 24 port switch (UPS#1) Netgear Sw2 1.253 (rear) (UPS#2) dataserver3 touchscreen2 (UPS#2) archive3 homeserver (UPS#1) BL0859: >> UPS2 << Breaker #35 gateway (UPS#2) BluRay Writer Raritan KVM switch (UPS#1) BL0860: netgear 10gig switch dataserver4 (UPS#2) homeserver2 (UPS#4) crush17 crush18 BL0861: voltron (UPS#5) pilatus2 (UPS#4) pilatus (old/off) windoze3 windoze2 fujitsu switch (old/off) archivePC (old/off) >> UPS #4 << Breaker #28 BL0862: HV PS for BPM Current Amps MultiChannel Analyzer for Vertex NimBin 24V PCLs Opto-Isolators (UPS#4) BL0863: >> UPS #5 << << Breaker #21 (Power Conditioner atop Hutch) MAXON 4-Axis xyz controller Gemini 4-Axis Big Motor Control (2 pmacs Mounted on Door) (UPS#4) BL0864: 9 old ADSC WinNT computers