Other beamlines:
8.3.1
12.3.1
8.3.1 last updated: Sat Oct 11 18:40:52 PDT 2025
sample: no beam mark

camera:

hutch:

no movement for 02:29:37 since Oct 11 16:11:17 2025
beam:

499.988513 mA
light available
hutch is hot
feedback system is on
last tuneup reached 178% of max at Oct 11 16:47:35 2025
final diode current was 166544 nA, equivalent to
5.058e+11 photons/s at div=3.3x0.45 mrad, 11111.0 eV and 500 mA (35.98 kGy/s)
cryostream is on at 100.01K, nozzle out, lN2 level is at
43% and set to autofill
expected to reach 20% at Sun Oct 12 14:38:47 PDT 2025
current user is
Beamline commissioning
with 13:19:05 left
next user is
Soft Start - Staff
at Oct 12 08:00:00
door closed for 02:19:29 since Oct 11 16:21:07 2025
00:00:17 ago last control activity at Oct 11 18:40:35 2025
00:23:28 ago at Sat Oct 11 18:17:24 PDT 2025
collected: /data/jamesh/badpix/10-11-25_11111/flood_5_00100.cbf

Exposure_time 9.9990500
Wavelength 1.11583
Detector_distance 300
Start_angle 227.9900
beam stop:

last 10 beam stops:

















/data is 81% full, still room for 1840757 images.
Other beamlines:
8.3.1
12.3.1